Experience Matters

 

LAND SERVICES, INC. is committed to providing quality services with integrity, which is the foundation that has allowed our business to operate and expand into a nationwide consulting firm.

LSI’s project experience includes over 100 projects with a total of over 25,000 project miles.

LAND SERVICES - Pipeline Projects. LAND SERVICES, Inc. - Electrical power line projects.

Our Experience

The following partial list includes recent projects that LAND SERVICES’ teams have or currently are providing their services:

  • 230kV and 500kV Electric Transmission System project in Wyoming and Idaho, 1,148 miles
  • Wind Energy Facility and 345kV Electric Transmission Line project in Utah, 88 miles
  • 115kV Electric Transmission System project in New Mexico
  • Electrical Power Line project in Alaska, 57 miles
  • 500kV Electrical Transmission Line project in Mississippi, 75 miles
  • 69kV Electrical Transmission Line project for State Highway Widening project
  • 345kV Long Island Sound Cable Crossing project
  • Natural Gas 36 and 42-inch Pipeline project in Louisiana, Mississippi and Alabama, 270 miles
  • Natural Gas 42-inch Pipeline project in Colorado through Missouri, 713 miles
  • Natural Gas 42-inch Pipeline project in Missouri through Ohio, 638 miles
  • Natural Gas 36 and 42-inch Pipeline project in New Mexico and Arizona, 25 miles
  • Natural Gas Pipeline project in Oregon, Washington and Idaho, 62 miles
  • Natural Gas Pipeline project in Oregon and Washington, 36 miles
  • Petroleum 12 and 16-inch Pipeline project in Texas, New Mexico and Arizona, 243 miles
  • Petroleum 12 and 16-inch Pipeline project in Texas, New Mexico and Arizona, 140 miles
  • Fiber Optic Cable project in California through Texas, 1,323 miles
  • Fiber Optic Cable project in Georgia, Alabama, Louisiana and Mississippi, 540 miles
  • Fiber Optic Cable project in Utah through California, 764 miles
  • Fiber Optic Cable project in Montana through Washington, 1,052 miles
  • Fiber Optic Cable project in Illinois through Minnesota, 505 miles
  • Fiber Optic Cable project in Illinois through Missouri, 295 miles
  • Fiber Optic Cable project in Colorado through Utah, 658 miles
  • Fiber Optic Cable project in Illinois through Colorado, 1,090 miles
  • Fiber Optic Cable project in Oklahoma, 111 miles
  • Fiber Optic Cable project in Texas, 300 miles
  • Fiber Optic Cable project in Washington through Oregon, 300 miles
  • Fiber Optic Cable project in Montana to Canada, 243 miles
  • Fiber Optic Cable project in New Jersey, 30 miles
  • Fiber Optic Cable project in Philadelphia to Pittsburg, Pennsylvania, technical services
  • Fiber Optic Cable project in Utah to Washington, technical services
  • Lightguide Cable project in British Columbia to Washington, 187 miles
  • Lightguide Cable projects in California, 217 miles
  • Lightguide Cable project in Utah through Idaho, 360 miles
  • Lightguide Cable project in Alabama through Kentucky, 400 miles
  • Lightguide Cable project in Washington through Idaho, 270 miles
  • Coaxial Cable Removal project in New Mexico through California, 220 miles
  • Coaxial Cable Removal project in Nebraska through  Wyoming, 525 miles
  • Highway 95 Widening project in Idaho
  • Alternate Highway project in Idaho
  • “A” Street Highway Improvement Project in Idaho
  • Pacific Coast Cable Landing Terminal project, fee acquisition and permitting
  • Oregon Coast Cable Landing project, Federal, State and Local permitting
  • Maintenance and Relocation project in Oregon, Washington, Idaho and Montana
  • Feasibility Study in Arizona through California

Contact Us